Design Space Quickly Dismantles Temporary Locker Rooms

modular-building-removal

Design Space can deliver quickly, and when necessary, demobilize in tight spots. Design Space provided four 3,000 square foot modular buildings for Claremont McKenna College to be used as Team Locker Rooms, Trainer’s Rooms, and an Equipment Room while Claremont constructed new permanent facilities. After construction was complete the path of travel was obstructed, so Design Space brought in the crews and equipment needed to get the job done safely and quickly. Within 2 days all four buildings were dismantled and removed to keep another phase of the project on track. Claremont’s teams can now move into their new facility and Design Space has a couple modular locker rooms and modular team rooms available to serve the next customer that needs these types of buildings, and needs them quickly!

For more information on our modular solutions, please call us at (866) 889-7777 or visit us online at DesignSpaceModular.com.