Design Space Delivers Project Management Offices for New Power Plant

power-plant-portland-general-electric_blog

As communicated by Portland General Electric: The next 20 years, demand for electricity to serve Oregon customers is expected to increase more than 45 percent, compared to 30 percent nationally. PGE’s new Carty Generating Station will help PGE serve existing customer demand, meet additional growth and maintain a reliable supply of power. The new 440-megawatt, clean energy, natural gas-fired Carty Generating Station will use a G-class turbine capable of producing enough electricity to serve about 300,000 residential customers.

The site at Boardman was a brand new location built from the ground up. Everything that was needed to support construction had to be brought to the site. This included an array of modular buildings, mobile offices, and portable storage containers to serve as project management offices for PGE, the general contractor, and jobsite offices for the sub-contractors. The contract to provide the modular buildings, mobile offices, and containers was won by Design Space Modular Buildings by its Tri-Cities branch. As a true testament to Design Space’s capabilities in sales, products and service, they provided the entire requirement of site offices, and not one other competitor provided a building or container to this site. The total requirement for the project included (32) modular complex floors, (3) mobile offices, (12) 20’ containers, (24) 40’ containers, and (8) Ground Level Offices. Another impressive project completed by Design Space, the leader in providing remote jobsite offices.

For more information on our mobile offices or portable storage containers, please call us at (866) 889-7777 or visit us online, DesignSpaceModular.com.